Nanjing Juli Chemical Machinery Co., Ltd
Home>Products>SHJ-95 series twin-screw extruder
SHJ-95 series twin-screw extruder
SHJ-95 series twin-screw extruder
Product details

SHJ-95Detailed configuration of twin-screw mixing and extrusion unit(For reference only)

SHJ95List of Typical Material Operation Abilities for Machines (Reference Values)

process

List of typical materials

Work capacityKg/h(Reference value)

blending modification

PEPPPS+SBSPA+EPDMPP+NBREVA+Silicone rubber, etc

700-1100

PEPAPCCPE+ABS(Alloy);ABS+TPUPBT+PETPP+PEclass

600-1000

filling modification

PEPPEVAclass+Calcium carbonate, talc powder, titanium dioxide powder;ABSPCPSclass+Aluminum hydroxide, magnesium hydroxide, antimony oxide

700-1000

PPPAABS+Iron powder, sulfur powder, ceramic powder

900-1200

Functional masterbatch

PPPAABSPBTclass+Flame retardants and other additives: Combustion supporting masterbatch

800-1100

PEPPPSclass+Starch: Biodegradable masterbatch

600-800

PE+Anti fog drops, stabilizers: dual anti masterbatch

600-750

PEEVA=ABSclass+Carbon black: black masterbatch

400-700

Masterbatch

PEPPABSASPAEVAPET+Pigments and additives

500-750

Fiberglass and carbon fiber reinforcement

PPPBTABSASPAPCPOMPPSPETclass+Long fibers, short fibers, carbon fibers, whiskers, etc

550-900

Various types of cable materials

HDPELDPELLDPEMDPEEVAPVCPPWaiting for cable insulation and sheath materials;PEPeroxide and silane cross-linked cable materials; Radiation cross-linked cable material

500-900

Special materials

EVAHot melt adhesive, polyurethane, fluororubber, fluoroplasticPPCigarette filter materialTPRshoe sole components+

450-1100

Reactive Extrusion

Polyamide condensation, polyamide melt polymerization, polyurethane addition polymerization, polycarbonate condensation reaction, etc

450-700

Exhaust volatilization

Chlorinated polypropylene, superabsorbent resin, chlorosulfonated polyethylene

200-500

powder coating

Polyester, epoxy, propylene ester, polyurethane, acrylic ester

1200-1400



1 SHJ95twin screw extruderTechnical Parameter
Twin screw aspect ratio36:1---60:1
Twin screw motor power 132KW DC

2、 Unit configuration
A. SHJ 95 Twin Screw Mixing and Extrusion Unit
a、 gearbox
1) Reduction ratio: 3.75:1
2) Output shaft speed: MAX400RPM
3) Input shaft speed: MAX1500RPM
4) The deceleration and torque distribution parts of the main transmission box are integrated, adopting a parallel three-axis design with a compact structure. Imported bearings are used for deceleration, torque distribution, and radial bearings on both output shafts.
b、 Lubricating oil cooling system
1) Oil pump motor 1.1KW
2) Lubricating oil model: Shanghai Haipai 6402 medium load gear oil, model 85W/90GL-4
3) Brand: Xi'an Oil Pump Factory
4) Condenser model: SL-415
5) Lubricating oil pump model: CB-B16
c、 Main motor
1) Main motor: 132KW (DC motor)
2) Motor speed (MAX): 1500RPM
d、 threaded rod
1) Screw diameter: Φ91mm
2) L/D=40:1
3) The screw is in the form of building blocks
4) The screw core shaft is made of 40CrNiMoA material, and the threaded element is connected to the core shaft in an involute shape, which has high strength, high load-bearing capacity, and easy disassembly and assembly.
5) The material of the screw component is high-quality high-speed tool steel W6MO5Cr4V2, which has undergone high-temperature vacuum quenching heat treatment.
6) Overall hardness HRC62~64
e、 Material cylinder
1) The material of the barrel is 45 steel as the base, and the eight shaped hole is equipped with a double alloy liner. The wear-resistant alloy a-101 (Fe-Cr-Ni-B+Carbide) has a hardness of HRC60-64, and the barrel length is L=360mm/section.
2) The first section of the cylinder is the feeding cylinder, the ninth section of the cylinder is the exhaust cylinder, the tenth section of the cylinder is the extrusion cylinder, and the remaining cylinders are closed cylinders.
3) Soft water circulation system
3.1 Soft water cooling is used inside the barrel.
3.2 The soft water tank is separated from the machine body for easy cleaning and maintenance.
3.3 Italian imported solenoid valve CEME9313
3.4 The water pipes are treated with chrome plated copper pipes.
3.5 Cooling method: Water cooling
3.6 Cooling pump: 0.75KW
3.7 Water tank capacity:~ 180L
f、 Heating system

Temperature control section, material cylinder section, heating element type
The first stage of feeding
Copper casting in the second section of Zone 1
Copper casting in the third section of Zone 2
Cast aluminum in the fourth section of Zone 3
Cast aluminum in the fifth section of Zone 4
Cast aluminum in the sixth section of Zone 5
Cast aluminum in the seventh section of Zone 6
Cast aluminum in the eighth section of Zone 7
Cast aluminum in the ninth section of Zone 8
Cast aluminum in the tenth section of the ninth district

Use a melting temperature thermocouple to measure the melting temperature of the material, and use a pressure sensor to measure the material pressure.

h、 Vacuum degassing device
1) SK-1.8B water ring vacuum pump, Zibo Lianyi Vacuum Pump Factory
2) Drive motor: 3.85KW AC
3) Maximum suction capacity: 108m ³/h
j、 electrical control system
1) 3X380V, AC 50Hz
2) The main electrical control components are Siemens products.
3) The control button is a Schneider product from France.
4) The twin-screw motor is a DC motor with a power of 132KW, and the speed control device of the twin-screw host is a British Continental speed controller.
5) The speed control device of the feeder is a frequency converter.
6) The temperature control instrument adopts products from RKC company in Japan, with dual channel intelligent type and one temperature control for each zone.
7) The range of the pressure gauge is 0~25Mpa
8) The solenoid valve adopts the Italian imported solenoid valve CEME9313
9) Heating is controlled by a temperature controller through a solid-state relay
10) Electrical control cabinet control includes: temperature control system; Drive system; Interlocking and control system.
k、 Interlocking control system
1) The oil lubrication system is interlocked with the main engine, that is, the main engine can only be started after the oil pump is started.
2) The feeding system is interlocked with the main engine, that is, the feeding machine can only be started after the main engine is started.
3) The pressure system is interlocked with the main unit, which means that when overpressure occurs, both the main unit and the feeding system stop working.
4) The current is interlocked with the host, that is, when there is an overcurrent, both the host and the feeding stop working.
B hot cutting auxiliary machine set
1) One hot cutting template with 120 holes and a diameter of 4.0mm
2) One hot knife holder and two knives.
3) One hot cutting granule cover, made of stainless steel, equipped with lighting fixtures and observation holes.
4) One set of screen changing device, using hydraulic plate screen changing, hydraulic station motor power 2.2KW
5) One hot cutting granule truck, with a motor power of 2.2KW and a frequency converter.
6) One Wen's tee connected to the hot cutting cover, with a diameter of 200mm
7) One first stage high-pressure conveying fan with a power of 15KW
8) The diameter of the first stage conveying stainless steel pipeline is 200mm and the length is 6m
9) One first stage cyclone separator, made of stainless steel with a diameter of 1000mm
10) One second stage high-pressure fan with a power of 7.5KW for conveying
11) Storage bin, made of stainless steel material, with a diameter of 1000mm. The diameter of the second stage conveying stainless steel pipeline is 160mm, with one Wen's tee and a pipeline length of 6 meters
12) One 1 square vibrating screen.
13) One spiral automatic feeding machine.
14) A set of automatic weighing, packaging, and sealing devices.
C、 spare parts
1) Three sets of heaters
2) One input and three output oil seals for the transmission case
3) Threaded component 300mm
4) Two pairs of asbestos gloves

3、 Training and Service
1) Provide on-site installation guidance.
2) On site debugging and testing of equipment.
3) Responsible for providing on-site operation and maintenance training to the personnel of Party A.
4) Provide a one-year free warranty for equipment failures caused by design or manufacturing quality, and ensure long-term supply of spare parts.
5) Provide long-term technical consulting services.
6) Within or outside the warranty period, the supplier shall provide clear solutions within 6 hours after receiving notification of equipment failure from the purchaser. If the supplier needs to send personnel, they shall be responsible for on-site maintenance within 10 hours (excluding transit time).

4、 Installation and debugging
After the arrival of the unit, the purchaser shall install the unit in place according to the technical documents provided by the supplier, and the supplier shall send commissioning personnel to the equipment installation site of the purchaser to guide the commissioning and installation. The demand side should have the conditions for trial operation. After the unit operates normally, it will be handed over, and the purchaser should provide the supplier with a user acceptance report. The materials required for the trial run shall be provided by the purchaser, and the process conditions for the trial run shall be determined by the purchaser and agreed upon by both parties.

5、 One copy of technical documentation.

Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!