VIP member
PTC electric humidifier
1、 Working principle: The ceiling mounted PTC humidifier generates steam by heating with a PTC electric heater. It fully utilizes the humidification p
Product details
PTC electric humidifier1 working principle:

The ceiling mounted PTC humidifier generates steam by heating with a PTC electric heater. It fully utilizes the humidification principle of PTC electric heaters to achieve the purpose of humidifying a certain space.
2、 Actual characteristics
1. Good sealing and high strength.
2. High humidification efficiency.
3. Flexible, easy to install, and space saving.
4. The local humidification effect is significant.
IIIPTCTechnical parameters of electric humidifier
Performance parameters of heater
|
Working voltage:
|
220V~380V 3N
|
Rated power
|
1.05~2.2KW
|
|
Inlet pressure:
|
≤0.3MPa
|
Interface torque:
|
≤ 3 kilograms
|
|
Power deviation:
|
40 ℃ water temperature flow rate 10L/min power deviation ± 5%
|
||
|
Job Introduction:
|
Liquids such as water, petroleum, fuel, and thermal oil
|
||
PTC humidifiers can also be used for fresh air exchange units
|
model
|
SJPT-1.6
|
SJPT-2.4
|
|
Wind resistance (pa)
|
0
|
0
|
|
Steam generation rate (kg/h)
|
1.6
|
2.4
|
|
Applicable fresh air volume (m3/h)
|
240~300
|
500~600
|
|
power supply
|
220V50Hz
|
220V50Hz
|
|
Power (KW)
|
1.2
|
1.8
|
4、 Heater wiring diagram: (outgoing line side up)
Note: A separate set of heating elements with the same color line corresponding to the top and bottom (such as A1-1T B1-1).
5、 Installation precautions
1. Please ensure that the water and electricity are in place before debugging.
2. It is strictly prohibited to splash or leak water (including other liquids) during the installation and use of heaters to avoid electrical leakage and safety accidents.
3. The working pressure of the heater shall not exceed 0.3Mpa, and it is strictly prohibited to seal the outlet to prevent overpressure.
4. The heater must be installed vertically, with the medium entering through the lower port and exiting through the upper port, and ensuring that the air inside the heater is completely discharged.
5. The working voltage and wiring method must strictly follow the requirements and wiring diagram for operation.
6. Please reserve some maintenance space during installation.
7. Solution to regional poor water quality: Adding a water softener device can solve the problem, which can be tested and selected with the manufacturer
Online inquiry
