Shandong Hongchang Tonghui Waterproof Technology Co., Ltd
Home>Products>Non asphalt based polymer self-adhesive membrane waterproofing roll
Product Groups
Firm Information
  • Transaction Level
    VIP member
  • Contact
  • Phone
    13805365511
  • Address
    Langjiaying Village, Tianliu Town, Shouguang City
Contact Now
Non asphalt based polymer self-adhesive membrane waterproofing roll
Non asphalt based polymer self-adhesive membrane waterproofing roll
Product details

微信图片_20200509173733

Non asphalt based polymer self-adhesive membrane waterproofing roll

Product Specifications

Thickness1.2mm 1.5mm 1.7mm 2.0mm Width: 1m 1.2m 2.0m 3.0m

Scope of application:Construction methods for basement floor and exterior walls of civil construction, basement floor and exterior walls poured after vertical excavation, floor and exterior walls of open cut tunnels and sunken roads, underground tunnels, subway station floor and exterior walls, and other external and internal waterproofing structures

Four major characteristics of engineering applications

1. Reliable quality

The roll material has a light weight and is easy to hang on the side wall facade and tunnel lining. The overlap is reliable and the construction quality is easy to ensure.

Under the influence of actual construction site environmental factors, the roll material can effectively bond with the concrete structure, forming a composite+fusion waterproof system, fully restoring and exerting the self waterproofing function of the concrete structure, and reducing the probability of leakage. The waterproof effect is guaranteed, and single-layer use can meet the requirements of the first level waterproof defense standard.

2. Shorten the construction period

The requirements for the base surface conditions are low, and the moisture content of the base surface has no impact on waterproofing work and is not affected by weather. Compared to traditional waterproofing methods, the simplified construction significantly optimizes the project schedule, such as omitting the construction and maintenance time of leveling layers, isolation layers, and protective layers, greatly shortening the overall project duration.

3. Simple system and low cost

The simplification of the construction of leveling layers, protective layers, etc. greatly reduces the system cost and also reduces the amount of earthwork excavation. The control of hidden costs in construction is also very obvious, such as reducing maintenance costs with low leakage rates, accelerating construction progress, and reducing financial expenses.

4. Safety and Environmental Protection

No need for primer or open flame operation, avoiding hazards and eliminating safety hazards while saving resources.

12

Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!