
【Target Audience】Drainage households that need to discharge sewage to the municipal drainage network and its ancillary facilities in Jinan City,Industrial, construction, catering, medical and other enterprises, institutions and individual businesses that discharge sewage into urban drainage facilities within the administrative area of Jinan City.
【 Processing conditions 】 1. Meet the conditions for connecting urban public drainage facilities, and the connecting facilities have passed the acceptance inspection.
2. The sewage discharged into urban public drainage facilities meets the national and local discharge standards.
【 Explanation of processing time limit 】 ■ Legal deadline: 20 working days ■ Commitment deadline: 15 working days
【 Basis for Handling 】 Regulations on Urban Discharge and Sewage Treatment (State Council Decree No. 641) and Measures for the Administration of Permits for Urban Sewage Discharge into Drainage Networks (Ministry of Housing and Urban Rural Development Decree No. 21)
Materials need to be prepared: application form, water quality testing report, drainage preparation plan, sewage pretreatment facilities, and some materials that need to be provided according to the actual situation. These materials need to be prepared by a professional company. Jinan Lufa Environmental Protection specializes in handling drainage certificates and preparing all the materials for drainage certificates. The company has relevant experience and a professional team to serve you. The time for applying for a drainage permit will not be too long, but it will not be very short either, because there is a lot of work to be done in the early stage of applying for a drainage permit. We need to prepare relevant materials, make inspection reports, and relevant departments need to go to the site for testing and inspection. Those that do not meet the conditions still need to be rectifiedIf the rectification is completed, it will take another period of time. After the rectification is finished, a re inspection will be conducted, and there will be spot checks after the re inspection. If it is found, it will be delayed for a few days. After entering the formal processing procedure, it will also take some time to obtain the permit. Therefore, according to the normal process and procedures, the required time is about two and a half months.
Jinan Lufa Drainage Permit Agency Process: We have established a long-term cooperation mechanism with relevant departments to process drainage permits under our cooperation mechanism. All business processes, including testing, will be given priority. We have professional personnel to handle some of the processes and links (provided that the applicant meets the conditions and cooperates well). In this way, we will greatly compress time, shorten it, and improve your efficiency, bringing you more profit space.
Our company has successfully provided drainage permit services for dozens of McDonald's restaurants in Jinan, and has received unanimous praise from customers. Our professional team and strong company strength are the solid foundation for our step-by-step success and the key reason for customers' confidence.
