VIP member
Introduction to the functions of the high-efficiency series discharge machining machine control panel
Introduction to the functions of the high-efficiency series discharge machining machine control panel
Product details
Function Introduction: | |
1. X-axis setting key and display area. | 27. Processing auxiliary voltage. Paragraphs 1-9 in total. |
2. Y-axis setting key and display area. | 28. There are carbon deposition levels from 0 to 9 in total. |
3. Z-axis setting key and display area. | 29. Used for processing special (superhard) materials. |
4. The exchange of XYZ and EDM display functions. | 30. Alarm code: 0. Normal 1. Abnormal fire prevention |
5. It can be used for ten stage automatic fine repair and single stage processing. | 2. Abnormal oil level 3. Carbon deposition 4. Top position |
6. Center point, processing time display function. | 5. Abnormal oil temperature 6. Three phase abnormality |
7. Conversion between absolute coordinates and relative coordinates. | 7. Model abnormality 8. Overload 9. Completed |
8. Number dots. | 31. Mirror processing function. . |
9. Decimal point. | 32. Sleep switch. |
10. Symbol keys. | 33. Oil level shutdown switch. |
11. Multiple function keys. Can display: | 34. Model invalid switch. |
A. Previous function keys B. Storage function C. Copy function | 35. Slowly discharge slag. |
12. Multiple function keys. Can display: | 36. The surface is uniform. |
A. Next page function B. Extraction function | 37. Lock the Z-axis and keep it still. |
13. Clear the numerical key. | 38. Fire stop switch. |
14. Data input key. | 39. Carbon deposition shutdown switch. |
15. Voltage meter. | 40. Sound switch. |
16. Ammeter. | 41. Pump motor switch. |
17. Can access ten sets of ten segment processing data. | 42. System parameters. |
18. There are ten processing conditions and processing depth memory. | 43. Z-axis up. |
19. There are current segments 1-9 in total. | 44. Discharge start switch. |
20. Processing discharge current. | 45. Z-axis downwards. |
21. Discharge working cycle. 1-9999μS | 46. Stop discharging or clear abnormal alarms. |
22. Discharge rest period. 1-999μS | 47. Emergency switch. |
23. Voltage between discharge electrodes. There are 0-9 paragraphs in total | 48. Buzzer. |
24. Servo stability | 49. Turn on the power switch. |
25. The height of slag discharge during discharge. There are 1-9 paragraphs in total. | 50. Turn off the power switch. |
26. Discharge machining time. There are paragraphs 0-9 in total. |
Note: Due to our company's constant pursuit of progress, any changes to specifications, data, or images will not be notified separately!