Zibo Jieyou Pump Industry Co., Ltd
Home>Products>FZB (L) small corrosion-resistant self-priming pump
Firm Information
  • Transaction Level
    VIP member
  • Contact
  • Phone
    15589352061
  • Address
    No. 19-1, Dahaiyan Section, Zhangbo Road, Boshan District, Zibo City, Shandong Province
Contact Now
FZB (L) small corrosion-resistant self-priming pump
One Overview FZB (L) type anti-corrosion self-priming pump is a small self-priming pump with a steel lined fluoroplastic structure, which has excellen
Product details


One overview
FZB (L) anti-corrosion self-priming pump is a small self-priming pump with a steel lined fluoroplastic structure, which has excellent corrosion resistance and self-priming performance. Suitable for absorbing strong oxidizing and corrosive media such as sulfuric acid, hydrochloric acid, nitric acid, and organic solvents with full concentration. The typical job positions are as follows:
1. The liquid stored in the storage tank is sucked into the measuring tank.
2. Unloading, unloading ships, etc.
II Structural features and technical performance
This series of pumps adopts a steel lined fluoroplastic (F46) structure, which combines the excellent corrosion resistance of plastic pumps with the strength of metal pumps. The pump body has better resistance to thermal deformation, stress damage caused by pipeline thermal expansion and contraction, installation reliability, and vibration resistance than all plastic self-priming pumps.
The FZB (L) small fluoroplastic self-priming pump is equipped with a mechanical seal and an overcurrent component made of fluoroplastic. This pump is suitable for clear liquid media below 80 ℃. The sealing pads that come into contact with the media include nitrile rubber, fluororubber (F246), and fluoroplastic (F4, F46), which can be selected according to the user's working conditions. This series of pumps only requires filling the pump with liquid before starting up, which can extract the vacuum and transport the liquid safely and conveniently.
III Explanation of Model Meaning and Material

Available materials:
Perfluoroethylene propylene F46
Polyvinylidene fluoride F2
Ultra high molecular weight polyethylene (UHMWPE)
4 Structural diagram of pump


Serial Number
model
internet trafficm3/h
lift(m)
rotational speed(r/min)
Maximum self-priming height(m)
Motor equipment(KW)
imports and exports(mm×mm)
drawing
FZB
FZB(L)
1
25FZB(L)-2.5-1.5
2.5
1.5
2900
4
0.75
32×25
1.rar
2
25FZB(L)-5-16
5
16
2900
4
1.1
32×25
3
25FZB(L)-8-10
8
10
2900
4
1.1
32×25
4
40FZB(L)-4-23
4
23
2900
4
2.2
40×32
2.rar

3.rar
4.rar
5
40FZB(L)-8-20
8
20
2900
4
2.2
40×32
6
40FZB(L)-12-15
12
15
2900
4
2.2
40×32
7
50FZB(L)-10-25
10
25
2900
4
3
50×40
5.rar
6.rar
8
50FZB(L)-16-20
16
20
2900
4
4
50×40
7.rar
8.rar
9
65FZB(L)-25-28
25
28
2900
4
5.5
65×50
9.rar
10.rar
10
65FZB(L)-35-20
35
20
2900
4
5.5
65×50
11
80FZB(L)-30-30
30
30
2900
4
7.5
80×65
11.rar
12.rar
12
80FZB(L)-45-25
45
25
2900
4
7.5
80×65
13
100FZB(L)-70-25
70
25
2900
4
11-15
100×80

Note: The parameters in the table are obtained through testing with clean water. If conveying other types of media, the self-priming height and motor power configuration may vary.
VI Installation dimension diagram and installation dimension table
FSB (L) Outline Drawing

Serial Number
model
electromotor(KW)
A
B
H1
H2
L1
L2
L3
L4
L5
L6
H
h
D1
D2
S1×n1
S2×n2
S3×n3
drawing
1
25FZB(L)
0.75
220
250
125
100
45
180
35
135
225
630
270
15
85
85
12×4
12×4
16×4
13.rar
2
25FZB(L)
1.1
220
250
125
100
45
180
35
135
225
630
270
15
85
85
12×4
12×4
16×4
14.rar
3
40FZB(L)
2.2
220
250
135
140
45
180
35
170
260
705
300
20
110
100
18×4
13×4
15×4
15.rar
4
50FZB(L)
3
300
345
145
150
45
220
35
120
285
800
338
20
125
110
18×4
13×4
16×4
16.rar
5
50FZB(L)
4
300
345
157
150
45
220
35
130
285
820
350
20
125
110
18×4
13×4
16×4
17.rar
6
65FZB(L)
5.5
330
380
177
160
55
260
50
163
305
875
405
22
145
125
18×4
14×4
18×4
18.rar
7
80FZB(L)
7.5
330
380
177
160
55
260
50
205
310
895
420
15
160
145
18×4
18×4
18×4
19.rar
8
100FZB(L)
11~15
375
425
210
170
70
365
70
150
415
1130
465
22
180
160
18×4
18×4
20×4

FZBOutline Drawing


Serial Number
model
electromotor(KW)
A
B
C
H1
H2
L1
L2
L3
L4
L5
L6
H
h
D1
D2
S1×n1
S2×n2
S3×n3
drawing
1
40FZB
2.2
230
230
270
162
140
90
380
125
150
260
1000
330
20
110
100
18×4
13×4
15×4
20.rar
2
50FZB
3
230
270
315
165
150
110
420
110
175
285
1075
360
25
125
110
18×4
13×4
15×4
21.rar
3
50FZB
4
230
310
355
165
150
110
420
110
175
285
1100
360
25
125
110
18×4
13×4
15×4
22.rar
4
65FZB
7.5
275
340
380
190
160
150
450
145
215
305
1250
415
25
145
125
18×4
14×4
18×4
23.rar
5
80FZB
7.5
275
340
380
190
160
150
450
145
225
310
1260
430
25
160
145
18×4
18×4
20×4
24.rar
6
100FZB
11~15
310
430
500
215
170
165
600
160
235
415
1500
475
35
180
160
18×4
18×4
20×4

7 Installation and usage precautions
Installation
1. The pump has been transported over a long distance to the production site. Before installation, it is necessary to check whether the parts of the entire machine are intact, tighten the fasteners, and check the concentricity between the pump shaft and the motor shaft. If there is any displacement, it should be corrected.
2. During installation, efforts should be made to minimize hydraulic losses in the suction pipeline. Bends smaller than 90 ° should not be installed, and there should not be more than 2 90 ° bends on the inlet pipeline. A filter screen should be installed at the pump inlet to prevent large impurities from entering the pump and ensure its normal operation.
3. The connecting bolts of the inlet pipe should be tightened evenly, and the seal should be tight without air leakage, otherwise it will seriously affect the self-priming performance of the pump.
Precautions for operation and use
1. Check whether the direction of motor operation is consistent with the direction mark of pump operation, and do not reverse it!
2. The pump body must be filled with liquid before it can start running, and it is strictly prohibited to run it without air. If the pump cannot produce liquid within the specified self-priming height range for 3-5 minutes, it should be stopped immediately to check the cause, in order to prevent the working fluid in the pump from heating up and damaging the pump.
3. After the first injection of liquid into the pump body, it is generally not necessary to inject liquid again. However, if the shutdown time is long or there is leakage in the seal after shutdown, the liquid in the pump may be lost. Before the second start-up, the liquid in the pump should be checked and filled before starting.
When not in use for a long time in winter, the liquid in the pump body should be drained to avoid freezing and malfunction.
Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!