Zibo Wanfang Electronic Technology Co., Ltd
Home>Products>Adding a 4KV high voltage test during the voltage withstand test of the electric energy meter will not cause any issues
Firm Information
  • Transaction Level
    VIP member
  • Contact
  • Phone
    13290113207/13290112885/13287089151
  • Address
    Room 409, Building A, High tech Entrepreneurship Park, Zibo High tech Zone, Shandong Province
Contact Now
Adding a 4KV high voltage test during the voltage withstand test of the electric energy meter will not cause any issues
1. The purpose of voltage withstand test is to test the insulation performance of the electric meter!
Product details
1. The purpose of voltage withstand test is to test the insulation performance of the electric meter!
2. Usually connect high voltage terminals to low voltage terminals! Leakage current is 5mA.
3. Voltage resistant wiring is different from normal wiring. Generally, the high voltage end is connected together and connected to four strong electrical terminals, while the ground wire is connected together and connected to a weak electrical terminal.
There is no circuit formed at all, and the electricity meter is not working at this time.http://www.zbwf.net
Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!