Weifang Guihe Waterproof Materials Co., Ltd
Home>Products>Plastic modified asphalt waterproofing membrane (APP)
Firm Information
  • Transaction Level
    VIP member
  • Contact
  • Phone
    1395366734513953667345
  • Address
    East of Hanzhuang Village, Taitou Town, Shouguang City, Shandong Province
Contact Now
Plastic modified asphalt waterproofing membrane (APP)
Plastic modified asphalt waterproofing membrane is a plastic modified asphalt waterproofing membrane made by using APP (random polypropylene) or APAO,
Product details
Plastic modified asphalt waterproofing membrane is a plastic modified asphalt waterproofing membrane made by using APP (random polypropylene) or APAO, APO (polybaked hydrocarbon polymer) modified asphalt as the dipping material, high-quality polyester felt and fiberglass felt as the tire base, fine sand, mineral particle (sheet) material, and PE film as the covering material, and refined by advanced technology.

● Strong impermeability
High tensile strength, high elongation, strong adaptability to base shrinkage deformation and cracking
Good high temperature resistance, corrosion resistance, mold resistance, weather resistance, puncture resistance, abrasion resistance, and tear resistance
Convenient construction, hot melt construction can be operated all year round, with tight joints, especially suitable for building waterproofing in environments with larger structures and higher temperatures.

High tensile strength and good dimensional stability
Good high temperature resistance, damage resistance, corrosion resistance, mold resistance, and weather resistance
Good construction performance and reliable joints
Convenient construction, hot melt construction can be operated all year round, reliable joints, especially suitable for building waterproofing in high temperature environments.

Before construction, the base layer that has passed the acceptance inspection should be cleaned up and the dust on the edges should be blown off.
The treatment of the base layer should be uniform and consistent, and repeated brushing should be avoided.
After the base treatment agent is dried, the roof waterproofing project and the underground waterproofing project that require additional layers should be laid with additional layers according to the design requirements.
Determine the sequence and direction of laying the roll material and mark the line on the base layer. If the roll material occupies space during laying, the pasting of different parts of the roll material should be carried out according to the requirements.
Roof: bonding of rolls and base points or strips; The 800mm surrounding area of the roof should be fully pasted; The bonding area of the sloping roof is over 70%, and 100% of the bonding between the rolls is complete;
Basement floor: The roll material can be fully bonded, point bonded, strip bonded, or laid empty to the base layer, but the roll material must be fully bonded between rolls;
Basement vertical wall: The rolls should be fully adhered to the base layer and between rolls;
Additional layer: Generally, all parts are fully pasted, and empty paving is allowed at deformation joints.

Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!