VIP member
Motorcycle oil pump testing system
Host introduction: This system uses a servo motor shaft to drag the oil pump for empty rotation, and measures the flow rate of the oil pump pressure
Product details
Comprehensive Performance Testing System for Oil Pump
|
Serial Number
|
physical property
|
subsystem
|
Equipment name
|
technical requirement
|
Specification and model
|
Number
|
notes
|
|
1
|
machinery
|
Pipeline device
|
1. Fuel tank and pipeline
|
Non standard customization
|
|
1 unit
|
|
|
2
|
Installation fixtures and platforms for two test oil pumps
|
Non standard customization
|
|
1 set
|
|
||
|
3
|
electrical
|
Cabinet 1
|
1. Vertical cabinet
|
Can hold 17 inch LCD display, Xunyan industrial control computer, including contactors, electrical switches, wiring, etc
|
VG-34
|
1 unit
|
|
|
4
|
2 measurement units
|
Variable frequency motor driver
|
1.1kW,5000rpm
|
|
1 unit
|
|
|
|
5
|
2 Flow measurement instruments
|
Real time display of flow rate in the oil system
|
|
1 unit
|
|
||
|
6
|
3 Pressure measuring instruments
|
Real time display of import and export oil pressure
|
|
2 units
|
|
||
|
7
|
4-speed measuring instrument
|
Real time display of oil pump speed
|
|
1 unit
|
|
||
|
8
|
5 Temperature measuring instrument
|
Control the display of oil temperature, real-time display of temperature in the fuel tank, and adjust the temperature in the fuel tank
|
|
1 set
|
|
||
|
9
|
6 Pressure transmitter (outlet)
|
(0~0.5)Mpa
|
BTL-900
|
1 piece
|
|
||
|
10
|
7 Pressure transmitter (imported)
|
(-0.1~0.1)Mpa
|
|
1 piece
|
|
||
|
11
|
8 Volumetric flowmeter
|
|
DN15
|
1 piece
|
|
||
|
12
|
3 Information supporting units
|
1 Industrial computer
|
2G memory, 500g hard drive, DVD drive, USB interface, Xunyan
|
IPC-8406
|
1 unit
|
|
|
|
13
|
2 displays
|
17 inch LCD screen, Dell
|
1 unit
|
|
|||
|
14
|
Upper computer software
|
Steady state performance test
|
load
|
Test speed, inlet pressure, outlet pressure, pipeline temperature, oil temperature, flow rate
|
VB3.0
|
1 set
|
Including expansion card
|
|
15
|
Installation materials
|
cable
|
Power cable
|
|
|
1 set
|
|
|
16
|
Freight and on-site debugging
|
|
|
Once
|
|
||
Explanation: 1. Wig budget quotation, valid for 3 months.
2. The above list is for routine configuration design. If there are any customization situations or equipment additions or deletions, they can be discussed and agreed upon with Weige.
Online inquiry
