Shenzhen Benniao Intelligent Technology Co., Ltd
Home>Products>Intelligent Building Systems Engineering
Product Groups
Firm Information
  • Transaction Level
    VIP member
  • Contact
  • Phone
  • Address
    21st Floor, COFCO Real Estate Group Center, Zone 3, Bao'an District, Shenzhen, Guangdong Province
Contact Now
Intelligent Building Systems Engineering
ZT-BMS is based on various integration technologies such as system integration, function integration, network integration, and software interface inte
Product details

ZT-BMSIt is based on various integration technologies such as system integration, function integration, network integration, and software interface integration, using standardized, modular, and serialized open design, adopting a three-tier system structure, and gathering information resources of all subsystems in the entire building on a unified integration platform through a distributed communication network. Integrated integration is mainly reflected in the following aspects:

Operation interface integration

ZT-BMSUnder the same interface environment, achieve centralized monitoring, control, and management of all dispersed subsystems, controllable devices, and various events within the building.

Open Integration

ZT-BMSSupport communication and protocol interfaces for many manufacturers' products currently on the market. due toZT-BMSUniversal interface implementation technology enables the system to have good scalability. For commonly used simple interface protocols, as long as their communication protocols and data formats are configured, they can be easily integrated intoZT-BMSIn the system.

Flexible integration mode

ZT-BMSIt adopts modular design and implementation, and the system supports optional configuration. It is configured and combined according to the actual environment and financial situation of different users, forming a management system with different subsystem modules, different functional modules, and different scales.

information sharing

Fully utilize real-time and historical information data from various subsystems within the building, and comprehensively utilize, analyze, and process it. Based on system optimization, facilitate the decision-making department of the building to organize reasonably, and carry out scheduling, collaboration, and command to implement decision-making plans and measures.

Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!