Shanghai Renming Electric Meter Co., Ltd
Home>Products>DDS2255 single-phase electronic energy meter
Product Groups
Firm Information
  • Transaction Level
    VIP member
  • Contact
  • Phone
    13585777355
  • Address
    Building F237, No. 2, Lane 158, Luoye Road, Xiaokunshan Town, Songjiang District, Shanghai
Contact Now
DDS2255 single-phase electronic energy meter
1. Purpose: The single-phase electronic energy meter series is produced according to the GB/T17215.321-2008 standard and is used to measure single-pha
Product details



1. Purpose

The single-phase electronic energy meter series is produced according to the GB/T17215.321-2008 standard and is used to measure single-phase AC active energy with a rated frequency of 50Hz and a rated voltage of 220V. This product uses specialized large-scale integrated circuits and SMT technology for measuring electrical energy to ensure measurement accuracy and reliability. To prevent data loss after power outages, a distributed motor meter is used.

2. Specifications


Reference voltage(V

Reference frequency(Hz

accuracy class

Basic current(A

220

50

1.0level

2.0level

5(20)10(40)A15(60)A20(80)A 30(100)A

3. Main technical parameters

3.1 Basic Error


Load current(A

Power factor

CosΦ)

Basic error limit (%)

1.0level

2.0level

zero point zero five

1.0

Ib1.5

±2.5

±zero point oneIb

Imax1.0

0.5L2.0

±

0.5±

zero point one1.5

Ib2.5

0.8(lagging)

±1.5

±

(Before stagnation)±

0.5zero point two

Ib1.0

2.5

0.8Imax

(lagging)1.0

±


±
(Advanced)
±

3.2 Start up
Under the conditions of reference voltage, reference frequency, and COS Φ=1.0, the energy meter can still operate normally when the load current is 0.04 Ib (primary meter) or 0.005 Ib (secondary meter).

3.3 Submersion


When there is no current in the current circuit of the energy meter and the voltage is 115% of the rated value, the energy meter should not record the amount of electricity (with a logic creep circuit).

3.4 Power consumption


The overall power consumption is less than 2W/5VA

4. Main structure and working principle

The electricity consumed by the user is sampled from the signals on the voltage divider and splitter, and sent to the amplification and multiplier circuit. The product signal is integrated and V/F converted, and then output through the logic frequency division circuit to drive the frequency input meter or LED display to measure the electricity.
5. Choose
Users should choose the above specifications reasonably based on the maximum actual power consumption in order to correctly record electricity consumption. Choosing specifications that are too large or too small can cause inaccurate measurement or overheating and burning.
6. Installation and wiring


6.1 The electric energy meter can be installed and used after passing the inspection and being sealed with a lead seal before leaving the factory.


6.2 The electric energy meter should be installed indoors, and the bottom plate of the meter should be fixed firmly. On fire-resistant walls, it is recommended to install at a height of 1.8 meters, in an environment of -20 to+55 ℃, with a relative humidity not exceeding 85%, and no corrosive gases in the air.
6.3 The electric energy meter should be wired according to the wiring diagram on the terminal cover. Copper wires and copper connectors should be used to introduce the 1.3.4.6 terminals. The 2 (+) and 5 (-) terminals are pulse output terminals for error detection or as pulse signal interfaces.

6.4 Wiring diagram


7. Transportation and Storage


7.1 The transportation and unpacking of the electric energy meter should not be subjected to severe impact. It should be transported and stored according to the provisions of GB/T 13384-2008 "General Technical Conditions for Packaging of Mechanical and Electrical Products", and placed according to the requirement of "upward" packaging box.


7.2 The energy meter should be stored in its original packaging in an environment with a temperature range of 0-40 ℃, relative humidity not exceeding 85%, and no corrosive gases in the air.


7.3 Energy meters should be stored in the warehouse and placed on shelves, with a stacking height of no more than five boxes. After unpacking, the stacking height of a single energy meter should not exceed 10.

8. Calculate


The actual electricity consumption for this month is obtained by subtracting the number in the black box at the end of this month from the number from the previous month. The specific example is as follows:
9. Guarantee period

Within 12 months from the date of manufacture, if there are any quality issues with the electric energy meter that do not meet national standards and the seal is intact, our factory will provide free repair or replacement.




Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!